Summary
Work includes 100 block 7th street from RR crossing south to hwy 60/66 approx. 800 SF apply level course, tack oil, mill tie in at 60/66 intersection, and 2" type B overlay. 2,150 SF on south 7th street. 3" mill, tack oil, with 3" type B asphalt overlay; mill tie in at excelsior street and highway 60/66 with approx. 10 SF edge mill along the outside edge of the driving lanes north from excelsior to highway 60/66. After milling is complete awardee will install tack and a 1" level up coarse prior to the 2" type B asphalt surface coarse. Awardee will provide all traffic control,traffic striping, hauling and disposing of milling material to designated site.