Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 100 block 7th street from RR crossing south to hwy 60/66 approx. 800 SF apply level course, tack oil, mill tie in at 60/66 intersection, and 2" type B overlay. 2,150 SF on south 7th street. 3" mill, tack oil, with 3" type B asphalt overlay; mill tie in at excelsior street and highway 60/66 with approx. 10 SF edge mill along the outside edge of the driving lanes north from excelsior to highway 60/66. After milling is complete awardee will install tack and a 1" level up coarse prior to the 2" type B asphalt surface coarse. Awardee will provide all traffic control,traffic striping, hauling and disposing of milling material to designated site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project involves sliplining two sections of 24-inch sanitary sewer main and rehabilitating three 60-inch manholes near the intersection of Highway 95 and 7th Street in Bullhead City, AZ.
Posted Date
Jan 21, 2026
Due Date
Feb 25, 2026
Release: Jan 21, 2026
Close: Feb 25, 2026
This project involves sliplining two sections of 24-inch sanitary sewer main and rehabilitating three 60-inch manholes near the intersection of Highway 95 and 7th Street in Bullhead City, AZ.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for a demolition project for properties located on 7th Street in Moline.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Close: Feb 6, 2026
This RFP is for a demolition project for properties located on 7th Street in Moline.
AvailableThe City of Westlake Village is soliciting proposals from an experienced consultant to prepare Plans, Specifications, and Estimate (PS&E) for the Lindero Canyon Road Complete Street Project to improve pedestrian safety and accessibility. The scope includes project management, public engagement, preliminary design, utility coordination, geotechnical investigations, final improvement plans, and support during bidding and construction with a period of performance through December 10, 2027. The project is partially funded by LA County Measure M funds and covers Lindero Canyon Road from Baronsgate Road to Lakeview Canyon Road.
Posted Date
Jan 20, 2026
Due Date
Mar 20, 2026
Release: Jan 20, 2026
Close: Mar 20, 2026
The City of Westlake Village is soliciting proposals from an experienced consultant to prepare Plans, Specifications, and Estimate (PS&E) for the Lindero Canyon Road Complete Street Project to improve pedestrian safety and accessibility. The scope includes project management, public engagement, preliminary design, utility coordination, geotechnical investigations, final improvement plans, and support during bidding and construction with a period of performance through December 10, 2027. The project is partially funded by LA County Measure M funds and covers Lindero Canyon Road from Baronsgate Road to Lakeview Canyon Road.
AvailableWork will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
Work will consist of asphalt paving, concrete curbs, concrete sidewalks, and stormwater pipe installation. The work also includes the demolition and removal of the existing concrete sidewalk, curb, and asphalt paving for the Road Rehabilitation Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.