Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction contract for drainage maintenance and improvement at 6445 Powers Ferry Road including replacement/rehabilitation of inlet and outlet headwalls, CIPP lining of 18" and 24" CMP, invert paving for twin 48" culverts, dewatering/bypass pumping, riprap, fencing, traffic control, and related site work.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Construction contract for drainage maintenance and improvement at 6445 Powers Ferry Road including replacement/rehabilitation of inlet and outlet headwalls, CIPP lining of 18" and 24" CMP, invert paving for twin 48" culverts, dewatering/bypass pumping, riprap, fencing, traffic control, and related site work.
Premium
Access the largest public sector contact database
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
Availableproject includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Posted Date
Sep 9, 2025
Due Date
Dec 29, 2025
Release: Sep 9, 2025
Close: Dec 29, 2025
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis