Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction contract for drainage maintenance and improvement at 6445 Powers Ferry Road including replacement/rehabilitation of inlet and outlet headwalls, CIPP lining of 18" and 24" CMP, invert paving for twin 48" culverts, dewatering/bypass pumping, riprap, fencing, traffic control, and related site work.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Construction contract for drainage maintenance and improvement at 6445 Powers Ferry Road including replacement/rehabilitation of inlet and outlet headwalls, CIPP lining of 18" and 24" CMP, invert paving for twin 48" culverts, dewatering/bypass pumping, riprap, fencing, traffic control, and related site work.
Premium
Access the largest public sector contact database
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Work includes replacement of a failed upstream headwall, and rehabilitation of a deteriorated outlet headwall, paving inverts of two 48" dia corrugated metal pipe culverts, rehabilitation of a 24" and an 18" dia drainage pipes using cured-in-place trenchless pipelining technique.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
Availableproject includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
Posted Date
Sep 9, 2025
Due Date
Dec 29, 2025
Release: Sep 9, 2025
Close: Dec 29, 2025
project includes: Traffic Control, Removal of Existing 3 x 36" 2 x 54" 2 x 36" RCP, Class B Rip Rap at Box Culverts, Class C Rip Rap to armor downstream channel w/Filter Fabric, 8 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, 6 x 5 x 6 Box Culvert w/Stone Bedding and Dewatering, Headwalls / Endwalls, Misc. Erosion Control / Water Management, Utility Relocation (Water and Sewer), 6" Graded Aggregate Base Course Uniform, 2' Asphalt Surface Course, Earthwork Fine Grade Right of Way Shoulders.Seeding / Stabilization, Asphalt Millings for Driveway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis