Summary
Removal of approx. 68" x 9' segment of existing concrete sidewalk and steps and properly dispose of all construction waste material. Prepare subgrade by tamping or rolling until thoroughly compacted and at the proper line and grade. Securely place forms for new concrete sidewalk 68' x 9' x 5" thick, two (2) steps 68' long with 7" riser and 12" run and 4' wide ADA complaint ramp. Install #4 rebar in steps and wire mesh in sidewalk and ramp. Install approx. 9' x 68' x 5" IDOT Class SI concrete sidewalk. Concrete shall have a minimum thickness of 5" or match existing if greater. Joint spacing shall match existing. Install 4' wide IDOT Class concrete ADA compliant ramp and handrail. The ramp will be two sided, approx. 6' long on each side of 5' landing at the building entrance. Install 68' of IDOT Class SI concrete steps. Remove approx. 8' x 68' of brick and concrete road in front of new steps and replace with 6" thick IDOT Class PP concrete pavement. All concrete must be 4,000 psi mix, broom finished and sealed with cure and seal. Material testing shall be provided by the contractor.