Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : 412.22 CY excavation class 20; 600 LF pile, steel h, 10"; 100 LF silt fence; 292.70 CY structural concrete; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work consist of approx 412.22 CY class 20 excavation; 600 LF 10" steel pile; 880 LF 12" steel pile; 100 LF silt fence; 282.70 CY structural concrete.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
The work consist of approx 412.22 CY class 20 excavation; 600 LF 10" steel pile; 880 LF 12" steel pile; 100 LF silt fence; 282.70 CY structural concrete.
AvailablePremium
Access the largest public sector contact database
Work includes : 48 LF culvert pipe; 556 SY engineering fabric; 367 CY structural concrete; 175 CY topsoil, strip/salvage/spread; see attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work includes : 48 LF culvert pipe; 556 SY engineering fabric; 367 CY structural concrete; 175 CY topsoil, strip/salvage/spread; see attached file.
AvailableWork includes : 114 CY excavation class 20; 50 LF guardrail, formed steel beam; 225 LF pile, steel h, 10"; 186 CY structural concrete; see attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work includes : 114 CY excavation class 20; 50 LF guardrail, formed steel beam; 225 LF pile, steel h, 10"; 186 CY structural concrete; see attached file.
AvailableWork includes : 124 CY excavation class 20; 350 LF pile, steel h, 10"; 1.00 LS removal of asbestos; 896 LF silt fence; see attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work includes : 124 CY excavation class 20; 350 LF pile, steel h, 10"; 1.00 LS removal of asbestos; 896 LF silt fence; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis