Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 1 LS clearing & grubbing, 218.2 CY excavation, 0.90 AC mulching, 15.14 Station pavement marking, 803.90 SY pavement, 360 LF 10" steel H pile, 0.90 AC seeding & fertilizing, 3 EA guardrail, 232.90 CY structural concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
Premium
Access the largest public sector contact database
Work includes approx. 157.20 Units clearing & grubbing, 158 CY excavation, 320 LF chain link fence, 57 LF guardrail, 0.90 AC seeding & fertilizing, 40.60 Station pavement markings, 952 SY pavement, 2,580 LF 12" steel H pile, 60 LF metal posts for signs, 366 SY sidewalk, 30 SF signs, 391 LF subdrain.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 157.20 Units clearing & grubbing, 158 CY excavation, 320 LF chain link fence, 57 LF guardrail, 0.90 AC seeding & fertilizing, 40.60 Station pavement markings, 952 SY pavement, 2,580 LF 12" steel H pile, 60 LF metal posts for signs, 366 SY sidewalk, 30 SF signs, 391 LF subdrain.
AvailableWork includes approx. 500 CY excavation, 1,295 LF 10" steel H pile, 91,377 Pound reinforcing steel, 415 CY structural concrete.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 500 CY excavation, 1,295 LF 10" steel H pile, 91,377 Pound reinforcing steel, 415 CY structural concrete.
AvailableWork includes approx. 2,757.10 CY excavation, 1,850 LF 10" steel H pile, 64,372 Pound reinforcing steel, 275.50 CY structural concrete.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 2,757.10 CY excavation, 1,850 LF 10" steel H pile, 64,372 Pound reinforcing steel, 275.50 CY structural concrete.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis