Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 500 CY excavation, 1,295 LF 10" steel H pile, 91,377 Pound reinforcing steel, 415 CY structural concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work includes approx. 157.20 Units clearing & grubbing, 158 CY excavation, 320 LF chain link fence, 57 LF guardrail, 0.90 AC seeding & fertilizing, 40.60 Station pavement markings, 952 SY pavement, 2,580 LF 12" steel H pile, 60 LF metal posts for signs, 366 SY sidewalk, 30 SF signs, 391 LF subdrain.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 157.20 Units clearing & grubbing, 158 CY excavation, 320 LF chain link fence, 57 LF guardrail, 0.90 AC seeding & fertilizing, 40.60 Station pavement markings, 952 SY pavement, 2,580 LF 12" steel H pile, 60 LF metal posts for signs, 366 SY sidewalk, 30 SF signs, 391 LF subdrain.
AvailableWork includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes 66,442 LB reinforcing steel, epoxy coated; 242 LF concrete open railing, TL-4; 144 LF culvert corrugated metal entrance pipe, 24" dia; 2,300 LF piles, steel HP 10 X42; 932 LF fence, field; 883 LF silt fence; 0.900 acre mulching; 1,129 SY engineering fabric; 1,210 ton revetment, class E; 4 EA. steel beam guardrail tangent end terminal, BA-225; 4 EA. steel beam guardrail end anchor, bolted; 258 CY structural concrete (bridge); 2,349 CY excavation, class 10 channel.
AvailableWork includes approx. 1 LS clearing & grubbing, 218.2 CY excavation, 0.90 AC mulching, 15.14 Station pavement marking, 803.90 SY pavement, 360 LF 10" steel H pile, 0.90 AC seeding & fertilizing, 3 EA guardrail, 232.90 CY structural concrete.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 1 LS clearing & grubbing, 218.2 CY excavation, 0.90 AC mulching, 15.14 Station pavement marking, 803.90 SY pavement, 360 LF 10" steel H pile, 0.90 AC seeding & fertilizing, 3 EA guardrail, 232.90 CY structural concrete.
AvailableWork includes approx. 1,270 CY excavation, 103.80 LF chain link fence, 0.20 AC mulching, 208 SY pavement, 2,105 LF 10" steel H pile, 69.70 LF metal rail, 0.20 AC seeding & fertilizing, 285.9 SY sidewalk, 362 LF water main.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Work includes approx. 1,270 CY excavation, 103.80 LF chain link fence, 0.20 AC mulching, 208 SY pavement, 2,105 LF 10" steel H pile, 69.70 LF metal rail, 0.20 AC seeding & fertilizing, 285.9 SY sidewalk, 362 LF water main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis