Summary
Work includes unclassified excavation (fm) 5.000 CY, granular material lvm, (class 5, group c) 634.000 CY, asphalt, st, 9.5 mm (overlay) 4,393.000 Ton, asphalt, st, 19 mm (base repair) 9.000 Ton, asphalt, st, 9.5 mm, leveling 403.000 Ton, cold milling of bituminous pavement, all depths 222.000 SY, additional construction signs, 4" wide thermoplastic edge stripe (continuous white) (90 mil) 8.723 mi, 4" wide thermoplastic traffic stripe (skip yellow) (120 mil) 3.063 mi, 4" wide thermoplastic traffic stripe (continuous yellow) (120 mil) 25,122.000 LF, thermoplastic legend (white) (120 mil) 388.000 LF. See attached file.