Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
State of Vermont solicitation for replacement of the fire alarm system at 32 Cherry Street, including removal and replacement of the existing fire alarm panel, devices, and wiring. The contractor must supply all labor, materials, and equipment per drawings/specifications, comply with Vermont prevailing wage requirements, and the project is expected to be funded through Vermont Capital Construction Act funds.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The State of Vermont (Department of Buildings & General Services) is soliciting proposals to remove and replace the existing fire alarm panel, devices, and wiring at 32 Cherry Street, including pull stations, smoke detectors and horn/strobes. The contractor must furnish all labor, materials, and equipment per drawings/specifications and comply with Vermont prevailing wage and fringe benefit requirements. The project is expected to be funded through Vermont Capital Construction Act funds and includes a non-mandatory pre-bid/site visit on 2025-11-19.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Premium
Access the largest public sector contact database
The State of Vermont (Department of Buildings & General Services) is soliciting proposals to remove and replace the existing fire alarm panel, devices, and wiring at 32 Cherry Street, including pull stations, smoke detectors and horn/strobes. The contractor must furnish all labor, materials, and equipment per drawings/specifications and comply with Vermont prevailing wage and fringe benefit requirements. The project is expected to be funded through Vermont Capital Construction Act funds and includes a non-mandatory pre-bid/site visit on 2025-11-19.
AvailableThe work shall include: Remove and replace existing fire alarm panel, remove and replace fire alarm system devices with new wiring and conduits to include pull stations, smoke detectors and horn/strobes, remove existing fire alarm system wiring to the greatest extent possible.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
The work shall include: Remove and replace existing fire alarm panel, remove and replace fire alarm system devices with new wiring and conduits to include pull stations, smoke detectors and horn/strobes, remove existing fire alarm system wiring to the greatest extent possible.
AvailableWork includes fire alarm system replacement.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Close: Jan 8, 2026
Work includes fire alarm system replacement.
AvailableProject scope includes replacing existing fire alarm system in its entirety with new voice evacuation fire alarm system. Existing fire alarm system shall be fully operational throughout all phases of construction. Demolish existing system once new system is installed, tested. Existing field device locations shall be reused whenever possible. Install new fire alarm system speaker as specified for voice evacuation. Portable buildings are included in scope.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Project scope includes replacing existing fire alarm system in its entirety with new voice evacuation fire alarm system. Existing fire alarm system shall be fully operational throughout all phases of construction. Demolish existing system once new system is installed, tested. Existing field device locations shall be reused whenever possible. Install new fire alarm system speaker as specified for voice evacuation. Portable buildings are included in scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis