Work includes clearing and grubbing within roadway, removal and disposal of existing asphalt pavement 2,262.000 SY, removal and disposal of existing bridge, unclassified excavation 53.000 CY, borrow excavation 11,561.000 CY, muck excavation 2,416.000 CY, geotextile, stabilization 1,698.000 SY, geogrid stabilization 2,730.000 SY, no 57 stone for backfill 1,898.000 Ton, granular bridge lift material 100.000 CY, fine grading 2,598.000 SY, flowable fill 200.000 CY, maintenance stone 10.000 Ton, hma shoulder widening course 169.000 ton, liquid asphalt binder pg64-22 67.000 Ton, full depth asph pav patching 6" unif 175.000 SY. See attached file.