Retrieving RFP details
Release
Close
City of Hallandale Beach
The work includes construction of approx. 2,800 LF of 30" force main (FM) either by horizontal directional drill (HOD) or open cut or a combination of both. Work includes approx. 1 LS mobilization, 192 LF C900 PVC pipe DR 18-30", 160 LF 12" DI pipe, 1 EA 20" tapping sleeve & gate valve, 1 LS horizontal directional drilling, 465 LF 30" HDPE pipe SDR 11, 150 LF 48" 75 FT long steel conductor casing, 4,000 SY asphalt pavement and patch, 6,000 SY 1.5" milling & resurfacing, 5,000 LF 6" thermoplastic single white striping, 65 SY 4" sidewalk, 5,000 SY sodding/ landscaping, 1 LS tree removal and replacement.
BID 25-26-02 30 INCH FORCE MAIN IMPROVEMENT PROJECT
zip
Town of Chapin
Work includes connect to the existing 8" force main on old bush river road, the installation of a 6,600-lf, 12" force main, combination of trench installation and jack and bore. Connect to the 16" force main at road.
City of Washington
The project consists of rehabilitating the existing Cherry Run Pump Station with two (2) new 300GPM pumps, extending the existing 12-force main serving Cherry Run and other west side pump stations by 1,380 LF (LF) along Plymouth Street and tie-in to the existing 18-inch force main at the WWTP, and replace approximately 2,200 LF of existing 12" cast iron force main and 4,400 LF of existing 8" cast ion/asbestos cement force main with new PVC force main of the same size.
Seminole County
Construction of a new sewer force main and reclaimed water main. The project involves the furnishing and installation of a new force main and reclaimed water main, which will be installed through open cut along the easement. The force main will be extended using directional drilling techniques. The existing gravity sewer main lacks the capacity to accommodate future flows from upcoming developments. Asphalt Removal and Replacement 1790 sy, Concrete Driveway and Sidewalk Removal and Replacement 75 sy, Concrete Curb and Gutter Replacement 26 lf, Landscape Restoration, Sodding and Hedges 41859 sf, 10" PVC Force Main - Open Cut 1989 lf, 10" HDPE Force Main - HDD 1797 lf, 12" PVC Reclaimed Water - Open Cut 1504, 12" HDPE Reclaimed Water - HDD 212 lf, Connection to Existing Wet Well - Lockwood Blvd 1 ea. See outside link or attached files.
Release
Oct 23, 2025
Close
Dec 01, 2025