Town of Chapin
Work includes connect to the existing 8" force main on old bush river road, the installation of a 6,600-lf, 12" force main, combination of trench installation and jack and bore. Connect to the 16" force main at road.
Harris County Mud 542
Offsite 12" Water Line and 8" Sanitary Force Main.
Carneys Point Township Sewerage Authority (CPTSA)
New 12,065 LF of 12" sanitary sewer force main from the existing wastewater treatment plant (WWTP) to the existing pump station. A second 6,790 LF force main in proposed to extend from the pump station to pump station. The second force main is 8" and features air-vacuum release valves at the local high points. A pigging station is proposed at pump station to allow for regular cleaning of the force main, and air-vacuum release valves will be placed at the all local high points. The pump station is also proposed to received a significant upgrade to convey flow from new development in the region; these upgrades include bu are not limited to: a second 10' diameter wet well, new valve vault with metering manhole, bypass to the existing force main, and new generator and electrical service upgrade.
Galveston County Wcid 1
This project consists of the trenchless installation of approx. 1,625 LF of 12" PVC C900 DR18 sanitary force main. The proposed 12" sanitary force main will replace an existing 8" sanitary force main which is to be abandoned as a part of this project. Connections of the proposed 12" sanitary force main will be made at two points in the existing sanitary collection system. See attached files.
Release
Oct 02, 2025
Close
Nov 06, 2025