Bid Schedule A Apron & Taxiway Improvements: Primary Work: Mobilization (Max of 10% of Bid Schedule A Cost), Contractor Quality Control Plan, Construction Safety Phasing Plan, 4750 SY of Asphalt Pavement/Base Removal (11 Nominal Depth), 330 SY of Cold Milling (2 Nominal Depth), 7,770 CY of Unclassified Excavation, 2,970 CY of Disposal of Excess Material, 2800 CY of Subbase Course (Furnished), 1,410 CY of Subbase Course (Recycled), 7,120 SY of Geotextile Separator Fabric, 1,500 SY of Geogrid, 1,060 CY of Aggregate Base Course, 160 SF of Pavement Marking Removal, 600 SF of Pavement Marking (Yellow), 40' of 18 RCP (Class III), 1,400 FT of 4 Perforated Underdrain Pipe, 190' of 4 Solid Underdrain Pipe, 5 Ea of Underdrain Cleanout, 5 Ea of Underdrain Cleanout w/Casting, 1 Ea of Connect Underdrain to RCP, 4 Acre of Seeding and Fertilizing, 590 CY of Topsoil (Removed from Stockpile), 19,360 SY of Mulching, 1 Ea of Field Laboratory, Type I, 25 Ea of L-853, 30", Type II, Style I, Retroreflective Marker, 3 Ea of Aircraft Tie-Down, 2 Ea of Install Salvaged 18 RCP Flared End, 3 Ea of Remove and Dispose of Aircraft Tie-Down, 10 Ea of Remove and Salvage Retroreflective Marker, 2 Ea of Remove and Salvage 18 RCP Flared End, Storm Water Pollution Prevention Plan, 400' of High Flow Silt Fence, 4 Ea of Culvert / Inlet Protection, and other items of related construction. Bid Schedule B Asphalt Paving Primary Work: Mobilization (Max of 10% of Total Project Cost), 1600 Ton of Asphalt Base / Surface Course, 109 Ton of Asphalt Binder (PG 64-34), 9 Ton of Emulsified Asphalt Prime Coat, 3 Ton of Emulsified Asphalt Tack Coat, and other items of related construction.
Available