Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of install one (1) new panasonic whisper ceiling 290 cfm surface-mount exhaust fan.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking to develop the available second floor space into storage spaces for tenants and the bnydc property management department, and an archive room. The space to be renovated is approx 38,000 SF. Work shall include demolition of the existing conditions on the Building 77 second-floor space and construction of the new storage, office, and archive spaces.
Posted Date
Nov 13, 2025
Due Date
Dec 19, 2025
Release: Nov 13, 2025
Close: Dec 19, 2025
Seeking to develop the available second floor space into storage spaces for tenants and the bnydc property management department, and an archive room. The space to be renovated is approx 38,000 SF. Work shall include demolition of the existing conditions on the Building 77 second-floor space and construction of the new storage, office, and archive spaces.
Premium
Access the largest public sector contact database
This is a Request for Proposals for the Chelsea District Court - Exhaust Fan Replacement Project in Massachusetts. The project involves the replacement of exhaust fans within the Chelsea District Court building. Bids are currently being accepted for this construction project.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
This is a Request for Proposals for the Chelsea District Court - Exhaust Fan Replacement Project in Massachusetts. The project involves the replacement of exhaust fans within the Chelsea District Court building. Bids are currently being accepted for this construction project.
AvailableRoof exhaust fan, mfr. Hartzell air movement a15eh-422na---alfmk4 quantity = 3 15e - direct drive hooded roof ventilator, exhaust tag: roof exhaust fan over pump #3 performance volume flow rate: 22400. 0 cfm sp: 0. 0 in. W. G. / tp: 0. 03 in. W. G. Rpm: 1160. 0 density: 0. 075 lbs/ft^3 operating temp: 70 f opwr: 2. 905 hp / spwr: 2. 905 hp motor hp: k - 3 hp rpm/volt/hz/phase: 4 - 1160, 230/460, 60, 3 enclosure: fm - tefc, mill and chemical duty, 1. 15 s. F. Frame size: 213t operating voltage: 460 vendor: tbd hartzell motor p/n: 3108-0016, mfct p/n: factory selected fan wind loads: less than 60 mph material: aluminum fan coating: none prop/wheel: na - fixed pitch 2 bladed prop - aluminum prop/wheel coating: none standard accessories (included) access door hinged, aluminum extended lube lines to motor bearings, copper additional accessories bird screen (hood), aluminum safety guard, aluminum.
Posted Date
Dec 9, 2025
Due Date
Dec 11, 2025
Release: Dec 9, 2025
Close: Dec 11, 2025
Roof exhaust fan, mfr. Hartzell air movement a15eh-422na---alfmk4 quantity = 3 15e - direct drive hooded roof ventilator, exhaust tag: roof exhaust fan over pump #3 performance volume flow rate: 22400. 0 cfm sp: 0. 0 in. W. G. / tp: 0. 03 in. W. G. Rpm: 1160. 0 density: 0. 075 lbs/ft^3 operating temp: 70 f opwr: 2. 905 hp / spwr: 2. 905 hp motor hp: k - 3 hp rpm/volt/hz/phase: 4 - 1160, 230/460, 60, 3 enclosure: fm - tefc, mill and chemical duty, 1. 15 s. F. Frame size: 213t operating voltage: 460 vendor: tbd hartzell motor p/n: 3108-0016, mfct p/n: factory selected fan wind loads: less than 60 mph material: aluminum fan coating: none prop/wheel: na - fixed pitch 2 bladed prop - aluminum prop/wheel coating: none standard accessories (included) access door hinged, aluminum extended lube lines to motor bearings, copper additional accessories bird screen (hood), aluminum safety guard, aluminum.
The Board of Regents of the University System of Georgia (BOR), on behalf of the University of Georgia, is soliciting Statements of Qualifications for construction management at-risk (CMAR) services for the renovation of approximately 7,900 square feet in the South Wing 2nd Floor of Cedar Street Building B to support synthetic biology and crop design research. The solicitation is open with an estimated value of $1,000,000–$3,000,000 and a proposal/response deadline of January 7, 2026.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
The Board of Regents of the University System of Georgia (BOR), on behalf of the University of Georgia, is soliciting Statements of Qualifications for construction management at-risk (CMAR) services for the renovation of approximately 7,900 square feet in the South Wing 2nd Floor of Cedar Street Building B to support synthetic biology and crop design research. The solicitation is open with an estimated value of $1,000,000–$3,000,000 and a proposal/response deadline of January 7, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis