Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Marion County, Florida is soliciting bids for the 26B-009 NE 58th Ave Resurface Project (TIP080454), a 3.09-mile roadway resurfacing and widening project from E Hwy 326 to NE 90th St Rd that includes reclaim/widening, pavement resurfacing, shoulder sodding, drainage work, driveway/side road aprons, and pavement markings. Bidders must submit required forms (bid bond, vendor info, similar work details, drug-free workplace certification, subcontractor disclosures) and comply with Marion County procurement instructions; questions are due Jan 1, 2026 and proposals close Jan 8, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Work consists of the replacement of approx 1,130 LF of 6" cast iron waterline with 8-inch ductile iron pipe from Weber Avenue NE west along 9th Street NE then through an off-road easement to Woodside Avenue NE. Approx 815 LF of 9th Street NE will then be reconstructed from Weber west to the cul-de-sac including new 304 aggregate, full depth asphalt pavement, concrete driveway aprons, and concrete curb and gutter.
Premium
Access the largest public sector contact database
The Work to be performed shall include: Construction of sidewalk and roadway widening from Smokey Point Boulevard to Hayho Creek, Grading, installation of vegetated faced geosynthetic wall, and installation of storm drainage facilities, Intersection improvements at 39th Avenue NE (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking), New pedestrian traffic signal at 156th Street NE and Smokey Point Boulevard, New illumination system along the corridor, Installation of landscape and irrigation improvements, and other work necessary to complete the Project.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The Work to be performed shall include: Construction of sidewalk and roadway widening from Smokey Point Boulevard to Hayho Creek, Grading, installation of vegetated faced geosynthetic wall, and installation of storm drainage facilities, Intersection improvements at 39th Avenue NE (curb ramps, curb and gutter, pavement restoration, hardscape/landscape features, and pavement marking), New pedestrian traffic signal at 156th Street NE and Smokey Point Boulevard, New illumination system along the corridor, Installation of landscape and irrigation improvements, and other work necessary to complete the Project.
AvailableThe City of Marysville is soliciting sealed bids to widen 156th Street NE from Smokey Point Boulevard to Hayho Creek, including sidewalk and roadway widening, drainage, a vegetated‑face geosynthetic wall, intersection upgrades, a new pedestrian signal, illumination, and landscaping. Bids are due at the City Clerk’s Office by 10:00 a.m. local time on December 15, 2025; plans and specifications are available via the Builders Exchange of Washington.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
The City of Marysville is soliciting sealed bids to widen 156th Street NE from Smokey Point Boulevard to Hayho Creek, including sidewalk and roadway widening, drainage, a vegetated‑face geosynthetic wall, intersection upgrades, a new pedestrian signal, illumination, and landscaping. Bids are due at the City Clerk’s Office by 10:00 a.m. local time on December 15, 2025; plans and specifications are available via the Builders Exchange of Washington.
AvailableRelease: Nov 14, 2025
Close: Jan 7, 2026
Road street resurfacing project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis