Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 200 LF of 3" rigid conduit in trench; 1,170 LF of 2 AWG, 1 conductor power cable; 8 CY of concrete base; 1 LS of misc. ITS asset management tool; 508 EA of misc. fiber optic jumper, SM; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of removal of improvements; 14 CY of class A excavation; 169 CY of compacting embankment; 59 STA misc. linear grading class 2 modified; 10,089 SY of 4" thick type 5 aggregate for base; 107 LF of 3" rigid conduit trench; see attached files.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Work includes 1 LS of removal of improvements; 14 CY of class A excavation; 169 CY of compacting embankment; 59 STA misc. linear grading class 2 modified; 10,089 SY of 4" thick type 5 aggregate for base; 107 LF of 3" rigid conduit trench; see attached files.
AvailableWork includes 442,407 LB of misc. removal, furnishing and placing hot polymer concrete patching material for class A partial depth repair; 3 EA of misc. 6' x 15' loop detector; see attached files.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Work includes 442,407 LB of misc. removal, furnishing and placing hot polymer concrete patching material for class A partial depth repair; 3 EA of misc. 6' x 15' loop detector; see attached files.
AvailableWork includes 2 EA of changeable message sign without communication interface, contractor furnished / retained; 5,506 LF of 24" white preformed thermoplastic pavement marking; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 2 EA of changeable message sign without communication interface, contractor furnished / retained; 5,506 LF of 24" white preformed thermoplastic pavement marking; see attached files.
AvailableWork includes 1 LS of removal of improvements; 91.100 STA of linear grading class 2; 6,471 SY of 4" thick type 5 aggregate for base; 354 SY of 8" non-reinf concrete pavement; 88 SY of 6" concrete median strip; see attached files.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Work includes 1 LS of removal of improvements; 91.100 STA of linear grading class 2; 6,471 SY of 4" thick type 5 aggregate for base; 354 SY of 8" non-reinf concrete pavement; 88 SY of 6" concrete median strip; see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →