Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS of removal of improvements; 84 SY of type 5 aggregate for base (4" thick); 24 TN of bituminous pavement mixture PG64-22, (BP-1); 56.600 SY of 4" concrete sidewalk; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 AC of clearing and grubbing; 175 CY of furnishing type 2 rock blanket; 115 SY of permanent erosion control geotextile; 5,115 SF of misc. powerwash and remove loose concrete; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 1 AC of clearing and grubbing; 175 CY of furnishing type 2 rock blanket; 115 SY of permanent erosion control geotextile; 5,115 SF of misc. powerwash and remove loose concrete; see attached files.
AvailableWork includes 371 SY of 6" thick type 1 aggregate for base; 5 TN of gravel (a) or crushed stone (b); 64. 200 TN of bituminous pavement mixture PF64-22, (BP-1); 58 gal. Of tack coat; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 371 SY of 6" thick type 1 aggregate for base; 5 TN of gravel (a) or crushed stone (b); 64. 200 TN of bituminous pavement mixture PF64-22, (BP-1); 58 gal. Of tack coat; see attached files.
AvailableWork includes bridge repairs.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes bridge repairs.
AvailableWork includes 1 AC of clearing and grubbing; 663 CY of class A excavation; 4,904 CY of embankment in place; 2,323 SY of 6" thick type 1 aggregate for base; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 1 AC of clearing and grubbing; 663 CY of class A excavation; 4,904 CY of embankment in place; 2,323 SY of 6" thick type 1 aggregate for base; see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →