Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2 AC of clearing and grubbing; 25,814 CY of class A excavation; 6,320 CY of compacting embankment; 45,324 SY of furnishing rock base material; 2,318 SY of 6" thick type 5 aggregate for base; see attached files.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Culvert replacements & rehabilitations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Culvert replacements & rehabilitations.
AvailableWork includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Work includes 262,040 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 15 EA. preformed thermoplastic pavement marking, left/right arrow; 204,363 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 3178 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 19,459 SY modified coldmilling (depth transitions); 2186 STA bituminous shoulder rumble strip; 1256 STA bituminous centerline rumble strip; 45 LF misc. Shaping slopes, class III-modified material requirement.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes 262,040 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 15 EA. preformed thermoplastic pavement marking, left/right arrow; 204,363 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 3178 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 19,459 SY modified coldmilling (depth transitions); 2186 STA bituminous shoulder rumble strip; 1256 STA bituminous centerline rumble strip; 45 LF misc. Shaping slopes, class III-modified material requirement.
Work includes 34 EA. Slab drain; 2,808 EA. Shear connectors; 406 LF type H barrier; 4,528 SF removal of existing bridge deck; 1,056 EA shear connections; 18 ea. Slab drain; 44 ea. Concrete post anchor for 2" psst - 7 GA. ; 440 LF 2" psst post -12 GA. ; 1,331 LF silt fence; 3,746 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 4,893 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 398 SY slab on steel; 290 LF type H barrier.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes 34 EA. Slab drain; 2,808 EA. Shear connectors; 406 LF type H barrier; 4,528 SF removal of existing bridge deck; 1,056 EA shear connections; 18 ea. Slab drain; 44 ea. Concrete post anchor for 2" psst - 7 GA. ; 440 LF 2" psst post -12 GA. ; 1,331 LF silt fence; 3,746 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 4,893 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 398 SY slab on steel; 290 LF type H barrier.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis