Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Missouri Department of Transportation
Work includes 262,040 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 15 EA. preformed thermoplastic pavement marking, left/right arrow; 204,363 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 3178 SY coldmilling bituminous pavement for removal of surfacing (3" Thick or less); 19,459 SY modified coldmilling (depth transitions); 2186 STA bituminous shoulder rumble strip; 1256 STA bituminous centerline rumble strip; 45 LF misc. Shaping slopes, class III-modified material requirement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Missouri Department of Transportation
Work includes 65,184 SY misc. Coldmilling existing pavement; 1,858 SY modified coldmilling (depth transitions); 1,809 LF 8 in. White class 1 pavement marking paint (18-mil, type p beads); 25,928 LF 4". Yellow class 1 pavement marking paint (18-mil, type P beads); 32,599 LF 6". White class 2 pavement marking paint (25-mil, type L beads); 8 EA preformed thermoplastic pavement marking, 24" X 36", yield line triangle; 660 LF preformed thermoplastic pavement marking, 24" White.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 65,184 SY misc. Coldmilling existing pavement; 1,858 SY modified coldmilling (depth transitions); 1,809 LF 8 in. White class 1 pavement marking paint (18-mil, type p beads); 25,928 LF 4". Yellow class 1 pavement marking paint (18-mil, type P beads); 32,599 LF 6". White class 2 pavement marking paint (25-mil, type L beads); 8 EA preformed thermoplastic pavement marking, 24" X 36", yield line triangle; 660 LF preformed thermoplastic pavement marking, 24" White.
AvailableMissouri Department of Transportation
Work includes 68 LF preformed thermoplastic pavement marking, 6". White; 18,532 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 3,802 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads); 33,436 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 3,669 tons asphaltic concrete mixture PG 70-22 (SP125C mix); 48 tons gravel (A) or crushed stone (B).
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 68 LF preformed thermoplastic pavement marking, 6". White; 18,532 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 3,802 LF 4" Yellow class 1 pavement marking paint (18-mil, type P beads); 33,436 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 3,669 tons asphaltic concrete mixture PG 70-22 (SP125C mix); 48 tons gravel (A) or crushed stone (B).
AvailableMissouri Department of Transportation
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
Missouri Department of Transportation
Work includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Missouri Department of Transportation
Close: Dec 12, 2025
Work includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis