Missouri Department of Transportation
Work includes 34 EA. Slab drain; 2,808 EA. Shear connectors; 406 LF type H barrier; 4,528 SF removal of existing bridge deck; 1,056 EA shear connections; 18 ea. Slab drain; 44 ea. Concrete post anchor for 2" psst - 7 GA. ; 440 LF 2" psst post -12 GA. ; 1,331 LF silt fence; 3,746 LF 4" White class 1 pavement marking paint (18-mil, type P beads); 4,893 LF 4" Yellow class 1 pavement marking paint (18-mil, type p beads); 398 SY slab on steel; 290 LF type H barrier.
251212-A02, FAS-S102 (077), JNW0014 - Bridge Deck Replacements
zip
Missouri Department of Transportation
Work includes 4,547 SF removal of existing bridge deck; 490 SY slab on steel; 10. 000 lf type h barrier; 494 SY slab on steel; 863 LF MGS guardrail; 8 EA. MGS bridge approach transition section (regular/no curb); 80 LF alternate ditch check; 1,000 LF silt fence; 1,156 SY coldmilling bituminous pavement for removal of surfacing (3". Thick or less); 1,818 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 799 SF construction signs; 128 tons bituminous pavement mixture PG64-22, (BP-1).
Missouri Department of Transportation
Work includes 109 SY bridge approach slab (minor road); 473 LF galvanized cast-in-place concrete piles (14 in); 18 EA. pile point reinforcement; 59.200 CY class B concrete (substructure); 425 SY slab on concrete I-girder; 559 LF type 2 (32"), prestressed concrete I-girder; 4100 LB reinforcing steel (bridges); 24 EA. slab drain; 2 EA. vertical drain at end bents; 264 LF silt fence.
Missouri Department of Transportation
Work includes 1 LS protective coating - concrete bents and piers (urethane); 202 LF type d barrier; 322 SY slab on steel; 18 SY bridge approach slab (minor road); 2,755 SF removal of existing bridge deck; 6 SF SHF-flat sheet fluorescent; 6 EA. concrete post anchor for 2.5 in. Psst. - 7 GA.; 96 LF 2.5 in. Psst post - 12 ga.; 2 EA. breakaway assembly (perforated square steel tube); 325 LF MGS guardrail; 4 EA. asymmetrical transition section, 6.5' Posts.
Release
Nov 06, 2025
Close
Dec 12, 2025