Summary
Los Rios Community College District is soliciting bids to replace the existing speaker system with a new loudspeaker reinforcement system and integrate it with the existing audio system in the Performing Arts Center at Sacramento City College. Work includes installation of electrical conduit and low-voltage wiring, control systems installation, and removal/replacement of a projection screen per the construction documents, with a 96-calendar-day period of performance from Notice to Proceed. Bidders must hold California CSLB B and C-7 licenses and comply with Department of Industrial Relations registration requirements.