Summary
New Tower Construction, Utilities, and Site Grading •A 250,000 Gallon elevated water tower with a height to overflow of 137.5 feet and all piping, fittings, appurtenances and valves; •Storage and control room finished inside tower; •Miscellaneous site and grading work; •Approximately 600 LF of 8” Restrained Joint Watermain; •All mechanical, electrical and control equipment necessary to provide a fully functioning facility; •Corrosion protection system components including coatings, linings, and cathodic protection systems; •Temporary and permanent erosion control, reclamation and seeding; •Traffic control and haul road maintenance during construction; •Reservoir and pipeline cleaning, flushing, hydrostatic pressure testing and disinfection; •Hydrodynamic mixing system; and •Clean up, startup services, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents. Existing Tower Demolition and Site Grading •Demolition and removal of existing water tower, foundation and existing appurtenances; •Site work, grading and seeding at existing water tower location; •Clean up, and all other miscellaneous work required but not herein mentioned but inferred from the construction Contract Documents. Bid Alternate - Salvage Existing Tank Bowl.