Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Douglas County Public Utility District No. 1 is soliciting bids for the Rapids 13.2kV expansion under Contract 25-36-D-BID. The solicitation is a Bid Documents – Labor and Material procurement and requires prequalification. Bids are currently open with a bid opening scheduled for January 26, 2026 at 1:30 PM local time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Douglas County Public Utility District (Douglas County PUD) issued a solicitation titled "25-38-D-BID, Overhead ACSR Conductor" for material-only bids of overhead ACSR conductor. The solicitation is currently open and the official buyer posting lists the bid opening/closing on 2026-01-12 at 1:30 PM local time; planholder registration/login is required to view additional bid documents. This is a procurement (materials only) solicitation, not a grant, and prequalification is not required.
Posted Date
Dec 4, 2025
Due Date
Jan 12, 2026
Release: Dec 4, 2025
Close: Jan 12, 2026
Douglas County Public Utility District (Douglas County PUD) issued a solicitation titled "25-38-D-BID, Overhead ACSR Conductor" for material-only bids of overhead ACSR conductor. The solicitation is currently open and the official buyer posting lists the bid opening/closing on 2026-01-12 at 1:30 PM local time; planholder registration/login is required to view additional bid documents. This is a procurement (materials only) solicitation, not a grant, and prequalification is not required.
Premium
Access the largest public sector contact database
This solicitation (Contract 25-39-D-BID) is for tapered steel structures for the Lone Pine to O’Malley project issued by Douglas County PUD in Washington. The posting indicates it is a materials-only bid and the bid opening/closing is 01/12/2026 at 1:30 PM (Bid Status: Open). Primary documentation is hosted on the Douglas County PUD website but requires planholder registration/login to view attachments.
Posted Date
Dec 6, 2025
Due Date
Jan 12, 2026
Release: Dec 6, 2025
Close: Jan 12, 2026
This solicitation (Contract 25-39-D-BID) is for tapered steel structures for the Lone Pine to O’Malley project issued by Douglas County PUD in Washington. The posting indicates it is a materials-only bid and the bid opening/closing is 01/12/2026 at 1:30 PM (Bid Status: Open). Primary documentation is hosted on the Douglas County PUD website but requires planholder registration/login to view attachments.
AvailableConstruction of a new 2,438 sq ft addition to an existing recreation center for seniors, including roof drain and exterior improvements, dance studio modification, new signage, HVAC, electrical, low voltage/audio visual systems, and acoustical finishes.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Construction of a new 2,438 sq ft addition to an existing recreation center for seniors, including roof drain and exterior improvements, dance studio modification, new signage, HVAC, electrical, low voltage/audio visual systems, and acoustical finishes.
AvailableRelease: Oct 22, 2025
Close: Dec 16, 2025
Park expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis