Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
27,718 SY HMA Removal, 17 Ton prime coat, 3,563 Ton HMA surface mix d, n50, 239 SY HMA pavement patching,1,500 SF PCC sidewalk removal and replacement, 1160 SF heavy duty PCC pavement removal and replacement 426 ft curb & gutter removal and replacement, 144 SF detectable warnings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
8,500 Tons - CA-16, CA-15 (special) or CA-16 (special); 3,500 Tons - stockpiled CA-6 or CA-10.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
8,500 Tons - CA-16, CA-15 (special) or CA-16 (special); 3,500 Tons - stockpiled CA-6 or CA-10.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Group A: Bit Mat Applied HFRS2P Job Site Gallons 380,000; Agg Spread Job Site Tons 15,500; Roller Job Site Tons 15,500; Bit Material Applied HFE-150 Gallons 40,000; Group B: Emulsified Asphalt, HFE-300 Job Site Gallons 170,000; Group C: Surfacing Material, CA-10 Job Site Tons 25,000; Group D: Surfacing Material, CA-10 FOB Truck Tons 10,000; Group E: Rip-Rap, RR 3 Job Site Tons 3,000; Group F: Rip-Rap, RR 3 FOB Truck Tons 2,000; Group G: Rip-Rap, RR 1 Job Site Tons 2,000; Group H: CA-2 3" Minus Job Site Tons 5,000; Group I: CA-2 3" Minus FOB Truck Tons 2,500.
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
Group A: Bit Mat Applied HFRS2P Job Site Gallons 380,000; Agg Spread Job Site Tons 15,500; Roller Job Site Tons 15,500; Bit Material Applied HFE-150 Gallons 40,000; Group B: Emulsified Asphalt, HFE-300 Job Site Gallons 170,000; Group C: Surfacing Material, CA-10 Job Site Tons 25,000; Group D: Surfacing Material, CA-10 FOB Truck Tons 10,000; Group E: Rip-Rap, RR 3 Job Site Tons 3,000; Group F: Rip-Rap, RR 3 FOB Truck Tons 2,000; Group G: Rip-Rap, RR 1 Job Site Tons 2,000; Group H: CA-2 3" Minus Job Site Tons 5,000; Group I: CA-2 3" Minus FOB Truck Tons 2,500.
AvailableOil bid and road work 55,000 gallons more or less.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Oil bid and road work 55,000 gallons more or less.
AvailableWork includes the removal of the existing bridge and the construction of a new 11'-9" tall x 27' wide single cell concrete box culvert, 97’ long, with object markers and w-beam rail, construction of gravel roadway, rock blanket, fencing.
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Work includes the removal of the existing bridge and the construction of a new 11'-9" tall x 27' wide single cell concrete box culvert, 97’ long, with object markers and w-beam rail, construction of gravel roadway, rock blanket, fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →