Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
27,718 SY HMA Removal, 17 Ton prime coat, 3,563 Ton HMA surface mix d, n50, 239 SY HMA pavement patching,1,500 SF PCC sidewalk removal and replacement, 1160 SF heavy duty PCC pavement removal and replacement 426 ft curb & gutter removal and replacement, 144 SF detectable warnings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing pavement and pavement surfaces, the required necessary base prep work to achieve the City standard cross slopes, structure adjustments, hot-mix asphalt placement, pavement markings and all incidental and collateral work.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Removal and replacement of existing pavement and pavement surfaces, the required necessary base prep work to achieve the City standard cross slopes, structure adjustments, hot-mix asphalt placement, pavement markings and all incidental and collateral work.
AvailablePremium
Access the largest public sector contact database
Removal of trees and stumps in DOT right-of-way along various county highways for the purpose of safety.
Posted Date
Nov 27, 2025
Due Date
Dec 17, 2025
Release: Nov 27, 2025
Close: Dec 17, 2025
Removal of trees and stumps in DOT right-of-way along various county highways for the purpose of safety.
AvailableWork include bridge deck replacement. The total length of improvement being 0.158 miles.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
Close: Dec 12, 2025
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Provide road maintenance work. Preferred equipment needed: grader, backhoe, dump truck, distributor truck, roller, chipper truck and brush cutter. Please provide a list of prices per hour for each machine and labor. Applicants must keep good records. Snow removal required when necessary.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Close: Jan 5, 2026
Provide road maintenance work. Preferred equipment needed: grader, backhoe, dump truck, distributor truck, roller, chipper truck and brush cutter. Please provide a list of prices per hour for each machine and labor. Applicants must keep good records. Snow removal required when necessary.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis