Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx earth excavation 1,175 CY: rem & disp uns matl 118 CY: trench backfill 37 CY: geotech fab f/gr stab 2,661 SY: topsoil f & p 4" 2,083 SY: seeding cl 1a 0.50 ac; mulch method 2 0.50 ac; perimeter eros bar 368 LF; sub gran mat a 4" 2,168 SY: sub gran mat a 12" 493 SY: agg base cse b 242 ton; pcc bse cse 8 1,162 SY: p HMA bc il19.0 n70 147 ton; p HMA sc il-9.5 d n70 575 ton; pcc pvt 10 jointed 787 SY: pavement rem 814 SY: HMA surf rem 1 3/4 4,700 SY: comb curb gutter rem 1,924 LF; storm sew cl a 1 12" 221 LF; storm sewer rem 12" 284 LF; man ta 5 dia t8g 1 ea; remov inlets 14 ea; comb cc&g tb6.12 564 LF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Oil bid and road work 55,000 gallons more or less.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Oil bid and road work 55,000 gallons more or less.
AvailableRoad work including utility trench restoration, and mill and paving overlay.
Posted Date
Jan 27, 2026
Due Date
Feb 10, 2026
Release: Jan 27, 2026
Close: Feb 10, 2026
Road work including utility trench restoration, and mill and paving overlay.
AvailablePerform road maintenance and grading work 2026.
Posted Date
Jan 30, 2026
Due Date
Feb 13, 2026
Release: Jan 30, 2026
Close: Feb 13, 2026
Perform road maintenance and grading work 2026.
AvailableThe solicitation seeks a contractor to construct a 10-foot-wide concrete path along the existing Great Western Trail near E. Harmony Road and Weld County Road 23. The project includes removals, earthwork, grading, and installation of two roadway crossings with rapid flashing beacons and pavement markings. Bids are due via BidNet Direct by February 13, 2026, at 2:00 PM MST.
Posted Date
-
Due Date
Feb 13, 2026
Close: Feb 13, 2026
The solicitation seeks a contractor to construct a 10-foot-wide concrete path along the existing Great Western Trail near E. Harmony Road and Weld County Road 23. The project includes removals, earthwork, grading, and installation of two roadway crossings with rapid flashing beacons and pavement markings. Bids are due via BidNet Direct by February 13, 2026, at 2:00 PM MST.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis