Summary
Work consist of 569 CY of special excavation, 1515 CY of trench backfill, 2730 LF of water main, 8" PVC, 2620 lf of water service piping, 57 EA of curb stop & box, 57 EA of water service tap & corp stop, 57 EA of curb stop & box removal, 3 EA of fire hydrant assembly w/ 6" tee & valve, 3 EA of fire hydrant assembly removal, 4 EA of water main valve abandonment, 1476 lf of 12" storm sewer pipe, 158 LF of 12" storm sewer, water main quality pipe, 18 EA of storm sewer drain basin,5 EA of storm sewer inlet remova, 620 SY of 7" PCC pavement patching, 969 SY of 6" hma pavement patching, 810 tn of HMA overay. See attached file.