Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sandy City seeks prequalification SOQs from contractors for 2026 utility construction work (storm drain and related utility infrastructure) at three sites, including installation of large-diameter reinforced concrete pipe (various diameters and elliptical sections), junction/inlet boxes, storm drain removal, canal/flume wall modifications, utility coordination/relocation, and roadway/landscape restoration. Responding firms must be Utah-registered, hold an appropriate contractor’s license, demonstrate ≥5 years municipal utility construction experience including at least three open-cut storm drain projects in urban settings (dewatering, bypass pumping, traffic control), have required bonding capacity and positive references, and provide a Project Manager and Superintendent with ≥10 years’ relevant experience.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sandy City requests Statements of Qualifications to prequalify contractors for 2026 municipal utility construction at three sites (Green Way, Bryce Drive, 700 East/Skylark). Scope includes large-diameter and elliptical RCP storm drain installations, junction/inlet boxes, utility coordination/relocation, outfalls and canal flume modifications, dewatering and bypass pumping, traffic control, and roadway/landscape restoration. Key prequalification requirements: Utah business registration and appropriate contractor license; ≥5 years municipal construction experience; Project Manager and Superintendent each with ≥10 years relevant experience; sufficient bonding capacity/unused bond; positive references; no litigation in last 5 years; completion of ≥3 open-cut storm drain projects in last 6 years in urban conditions; ability to start mid‑March 2026 and finish mid‑September 2026.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Sandy City requests Statements of Qualifications to prequalify contractors for 2026 municipal utility construction at three sites (Green Way, Bryce Drive, 700 East/Skylark). Scope includes large-diameter and elliptical RCP storm drain installations, junction/inlet boxes, utility coordination/relocation, outfalls and canal flume modifications, dewatering and bypass pumping, traffic control, and roadway/landscape restoration. Key prequalification requirements: Utah business registration and appropriate contractor license; ≥5 years municipal construction experience; Project Manager and Superintendent each with ≥10 years relevant experience; sufficient bonding capacity/unused bond; positive references; no litigation in last 5 years; completion of ≥3 open-cut storm drain projects in last 6 years in urban conditions; ability to start mid‑March 2026 and finish mid‑September 2026.
AvailableContractor prequalification for educational facilities construction projects and repairs.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Contractor prequalification for educational facilities construction projects and repairs.
AvailableProvide contractors to apply for prequalification to participate in certain construction projects for the fiscal year 2025-2026. Trade also includes general engineering, general construction, insulation and acoustical, boiler, hot-water heating system fitting, framing and rough carpentry, cabinetry, millwork, finish carpentry, general low voltage electrical, concrete contractor, drywall contractor, electrical, elevator contractor, earthwork/paving. See attached file.
Posted Date
Jul 1, 2024
Due Date
Jun 30, 2026
Release: Jul 1, 2024
Close: Jun 30, 2026
Provide contractors to apply for prequalification to participate in certain construction projects for the fiscal year 2025-2026. Trade also includes general engineering, general construction, insulation and acoustical, boiler, hot-water heating system fitting, framing and rough carpentry, cabinetry, millwork, finish carpentry, general low voltage electrical, concrete contractor, drywall contractor, electrical, elevator contractor, earthwork/paving. See attached file.
The work along green way includes the installation of approximately 930 feet of 24" dia rcp, 230 FT of 19"x30" elliptical rcp, 290 FT of 18" dia rcp, and 50 FT of 15" dia rcp; installation of junction boxes and inlet boxes; coordination with third party utilities for their relocation; removal and disposal of existing storm drain infrastructure; removal of existing waterways, regrading, and new asphalt installation. See outside link.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
The work along green way includes the installation of approximately 930 feet of 24" dia rcp, 230 FT of 19"x30" elliptical rcp, 290 FT of 18" dia rcp, and 50 FT of 15" dia rcp; installation of junction boxes and inlet boxes; coordination with third party utilities for their relocation; removal and disposal of existing storm drain infrastructure; removal of existing waterways, regrading, and new asphalt installation. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis