Summary
Work includes seasons road bridge replacement involves the removal and replace 72"x84" dual elliptical corrugated metal pipes with dual 84" aluminized metal pipes. This includes minor roadway improvements, guardrail and earthwork, clearing and grubbing; 381 ft guardrail removed; 80 SY pavement planing (t=1. 5"); 47 CY asphalt concrete base, (449), pg64-22; 27 CY asphalt concrete surface course, type 1, (449), pg64-22; 387.50 ft guardrail, type mgs; 2 EA anchor assembly, MGS type e; 8 EA barrier reflector, type 2, bidirectional; 1,129 SY seeding and mulching; 57 SY repair seeding and mulching; 0.25 TON commercial fertilizer; 696 SY erosion control mat; 50 CY excavation; cofferdams and excavation bracing; unclassified excavation.