Summary
Full-width mill and overlay of eight Township roadways (35,789 SY/3,250 TON). The contract will also include the replacement of 32 handicap ramps (508 LF of concrete curb, 5,340 SF of concrete sidewalk, 80 LF of concrete cheek wall and 355 SF of detectable warning surface), the replacement of 31 LF of concrete driveway depression, the replacement of 1 EA Belgian block curb, 505 SY of pavement repair, 880 TON leveling/scratch course and the replacement of all pavement markings. Alternate/Add-On No. 1 will generally include work along the Authority's Pump Station driveway located off Red Maple Court, consisting of a 3" mill, 2" 19 mm binder course and a 1-1/2" 9.5 mm wearing course (190 SY)