Full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the National Forest. Work includes: Phase A: Site Investigation and Analysis Phase B: Design and Construction Document Preparation; Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
Full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the National Forest. Work includes: Phase A: Site Investigation and Analysis Phase B: Design and Construction Document Preparation; Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
Work includes bridge construction access, bonds and insurance, construction stakes, lines and grades, cpm progress schedule, clearing and grubbing within right of way, removal and disposal of existing bridge, unclassified excavation 251.000 CY, borrow excavation 4,893.000 CY, muck excavation 1,274.000 CY, geotextile, separation 1,038.000 SY, geogrid reinforcement (biaxial) 1,663.000 SY, stone bridge lift material 998.000 Ton, granular bridge lift material 100.000 CY, fine grading 1,175.000 SY, flowable fill 50.000 CY, maintenance stone 10.000 Ton, hma shoulder widening course 80.000 Ton, liquid asphalt binder pg64-22 40.000 Ton, milling existing asphalt pavement (variable) 100.000 SY. See attached file.
The City of Lenexa Municipal Services is soliciting sealed bids to replace an existing trail segment in Lenexa, KS, including removal of existing trail, installation of new trail surface, grading, drainage, and related site work. Bids must be sealed, include 5% bid security, and will be publicly opened on April 29, 2026; a mandatory pre-bid conference is scheduled for April 23, 2026 at 10:30 AM. Plans, specifications, and addenda are available from Drexel Technologies' project page; bids must be submitted to Municipal Services at 7700 Cottonwood, Lenexa, Kansas.
The City of Lenexa Municipal Services is soliciting sealed bids to replace an existing trail segment in Lenexa, KS, including removal of existing trail, installation of new trail surface, grading, drainage, and related site work. Bids must be sealed, include 5% bid security, and will be publicly opened on April 29, 2026; a mandatory pre-bid conference is scheduled for April 23, 2026 at 10:30 AM. Plans, specifications, and addenda are available from Drexel Technologies' project page; bids must be submitted to Municipal Services at 7700 Cottonwood, Lenexa, Kansas.
The State of Delaware is seeking qualified contractors to replace the Tweeds Mill Bridge and perform 280 linear feet of stream restoration at White Clay Creek State Park. The project involves sealed competitive bidding with a mandatory pre-bid meeting scheduled for April 29, 2026. Contract documents are distributed electronically via the State's Egress Switch secure email system following an online request.
The State of Delaware is seeking qualified contractors to replace the Tweeds Mill Bridge and perform 280 linear feet of stream restoration at White Clay Creek State Park. The project involves sealed competitive bidding with a mandatory pre-bid meeting scheduled for April 29, 2026. Contract documents are distributed electronically via the State's Egress Switch secure email system following an online request.
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Work includes bridge construction access, bonds and insurance, construction stakes, lines and grades, cpm progress schedule, clearing and grubbing within right of way, removal and disposal of existing bridge, unclassified excavation 251.000 CY, borrow excavation 4,893.000 CY, muck excavation 1,274.000 CY, geotextile, separation 1,038.000 SY, geogrid reinforcement (biaxial) 1,663.000 SY, stone bridge lift material 998.000 Ton, granular bridge lift material 100.000 CY, fine grading 1,175.000 SY, flowable fill 50.000 CY, maintenance stone 10.000 Ton, hma shoulder widening course 80.000 Ton, liquid asphalt binder pg64-22 40.000 Ton, milling existing asphalt pavement (variable) 100.000 SY. See attached file.