Aerated Static Pile Facility Construction. The Project includes the furnishing of all labor, materials, and equipment necessary to complete the work, which generally consists of the following: Demolition and disposal of structures and asphalt. Excavation, stockpiling and backfilling. Connection to existing electrical utilities. Installation of electrical conduit, cable, equipment, and instruments. Installation of irrigation and contact water piping, and other piping, including all valves, fittings and appurtenances. Installation of contact water sump and process water tank, including associated pumps and controls, and inlet and outlet piping and supports. Installation of concrete slabs and pads, pre-cast concrete walls, bin blocks, and bollards. Installation of trench drains and associated concrete and piping. Installation of aeration fan, piping, pipe supports, valves, instruments and aeration trench components. Installation of asphalt pavement. Installation of an office trailer. Installation of signage and appurtenances. Installation of sprinklers, hoses, heat trace, insulation and appurtenances. Installation of control panel and associated systems. Perform all necessary checkout, start-up, and testing of systems. Provide coordination, shutdown procedures, and connections to existing electric utilities. Providing temporary field offices, storage, sanitary facilities, power, and communication equipment. Surveying, site preparation, erosion and sediment controls and restoration.
Available