Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Performing routine and emergency maintenance and repair to the mechanical, electrical, instrumentation, and materials associated with the authority's sanitary sewerage collection system on an as requested basis through 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
AvailablePremium
Access the largest public sector contact database
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
The City of Hinesville is soliciting proposals to rehabilitate the Highway 196 Pump Station. Work will include upgrades/repairs to station equipment and associated site work; proposals are due January 14, 2026 at 2:00 PM ET.
AvailableProject includes installation of 8' by 6' precast concrete bypass structure with cast-in-place concrete base, stainless steel weir assembly, and monolithic liner; Improvements and conversion of existing wet well and dry pit into auxiliary overflow storage structure; • Installation of approximately 60 LF of 24" new sanitary sewer pipe; Installation of two 60" precast concrete sewer manholes; Installation of one 12' by 12' precast concrete wet well with monolithic liner; Installation of four submersible pumps with all controls, piping, valves, fittings, and appurtenances; Installation of one 16' by 8' precast concrete valve vault: Installation of one 60" precast concrete manhole with magnetic flow meter; Installation of one elevated generator building with exterior platform and natural-gas-powered backup generator and electrical equipment and pump station electrical components; Removal, relocation, and installation of electrical riser poles, transformers, and overhead lines; • New Spire Gas service and relocations; Site improvements, including gates, fencing, concrete paving, concrete pump station pad, lighting, and restoration work.
Posted Date
Oct 30, 2025
Due Date
Dec 19, 2025
Release: Oct 30, 2025
Close: Dec 19, 2025
Project includes installation of 8' by 6' precast concrete bypass structure with cast-in-place concrete base, stainless steel weir assembly, and monolithic liner; Improvements and conversion of existing wet well and dry pit into auxiliary overflow storage structure; • Installation of approximately 60 LF of 24" new sanitary sewer pipe; Installation of two 60" precast concrete sewer manholes; Installation of one 12' by 12' precast concrete wet well with monolithic liner; Installation of four submersible pumps with all controls, piping, valves, fittings, and appurtenances; Installation of one 16' by 8' precast concrete valve vault: Installation of one 60" precast concrete manhole with magnetic flow meter; Installation of one elevated generator building with exterior platform and natural-gas-powered backup generator and electrical equipment and pump station electrical components; Removal, relocation, and installation of electrical riser poles, transformers, and overhead lines; • New Spire Gas service and relocations; Site improvements, including gates, fencing, concrete paving, concrete pump station pad, lighting, and restoration work.
AvailableProviding materials, supplies, and equipment needed for road, drainage, and sewer reconstruction for the Sewerage Authority on an as requested basis through 2026.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Providing materials, supplies, and equipment needed for road, drainage, and sewer reconstruction for the Sewerage Authority on an as requested basis through 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis