Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 2026 emergency digging.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Jan 5, 2026
Close: Jan 27, 2026
Emergency Profiling and Street Paving.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide grave digging services for burials at the cemetery. This includes the opening and closing of graves for full body interments, in coordination with the Cemetery s Superintendent. The Contractor will be responsible for the following services: Opening and closing graves for casket burials Backfilling graves and restoring surface level (including loam and seeding as necessary) Coordination with the Cemetery Superintendent regarding grave location and schedule Handling in winter conditions, including snow removal and frost-layer excavation, if needed Ensuring respectful conduct and minimal disruption during burial services.
Posted Date
Dec 27, 2025
Due Date
Jan 15, 2026
Release: Dec 27, 2025
Close: Jan 15, 2026
Provide grave digging services for burials at the cemetery. This includes the opening and closing of graves for full body interments, in coordination with the Cemetery s Superintendent. The Contractor will be responsible for the following services: Opening and closing graves for casket burials Backfilling graves and restoring surface level (including loam and seeding as necessary) Coordination with the Cemetery Superintendent regarding grave location and schedule Handling in winter conditions, including snow removal and frost-layer excavation, if needed Ensuring respectful conduct and minimal disruption during burial services.
AvailableThe City of Omaha (project listed under OPW 55102) seeks contractors to perform emergency utility cut repairs on major roadways, including concrete pavement repair, full-depth concrete repair, and sidewalk replacement. Contractors must be able to mobilize within 24 hours and provide ongoing emergency repair services for a one-year duration under city standards and ADA compliance. The solicitation is an Invitation for Bid with an estimated budget range (aggregated estimate) and includes equipment, mobilization, and liquidated damages requirements.
Posted Date
Dec 31, 2025
Due Date
Jan 14, 2026
Release: Dec 31, 2025
Close: Jan 14, 2026
The City of Omaha (project listed under OPW 55102) seeks contractors to perform emergency utility cut repairs on major roadways, including concrete pavement repair, full-depth concrete repair, and sidewalk replacement. Contractors must be able to mobilize within 24 hours and provide ongoing emergency repair services for a one-year duration under city standards and ADA compliance. The solicitation is an Invitation for Bid with an estimated budget range (aggregated estimate) and includes equipment, mobilization, and liquidated damages requirements.
AvailableProject includes replacement of uninterruptible power supplies, panelboards, transformers, surge protection devices, and lighting fixtures for the affected locations described in the drawings. Electronic safety and security scope includes fire alarm work for preaction sprinkler system monitoring and installation of SAACS door security for electrical room doors. Mechanical work includes the addition of a preaction sprinkler system. Controls work includes electrical equipment monitoring. Telecommunications work include backbone fiber cabling and horizontal category cabling installation to support mechanical and electrical network connected equipment. Work also includes CIP concrete, doors and hardware for card reader systems, and painting.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
Project includes replacement of uninterruptible power supplies, panelboards, transformers, surge protection devices, and lighting fixtures for the affected locations described in the drawings. Electronic safety and security scope includes fire alarm work for preaction sprinkler system monitoring and installation of SAACS door security for electrical room doors. Mechanical work includes the addition of a preaction sprinkler system. Controls work includes electrical equipment monitoring. Telecommunications work include backbone fiber cabling and horizontal category cabling installation to support mechanical and electrical network connected equipment. Work also includes CIP concrete, doors and hardware for card reader systems, and painting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →