Summary
3,500 SY of bituminous road removal; 700 LF of 15", 24" and 48" RCP storm sewer pipe; 10 ea of storm sewer structures; 350 LF of 8" PVC sanitary sewer; 2 ea of sanitary sewer manholes; 700 LF of 6" to 12" PVC watermain; 2,500 LF of 4"- 8" drain tile; 4,000 CY of common excavation; 1,500 tn of aggregate base; 3,100 CY of granular borrow; 700 CY topsoil borrow; 650 TN of bituminous course mixture; 1,300 LF of concrete curb and gutter; 9,000 SF of concrete walk and driveway. Along with traffic control, erosion control, dewatering, restoration, signing, clearing and grubbing, and correlated appurtenances. This will be a prevailing wage project.