Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide commercial-public street striping project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes mobilization, traffic control, striping citywide streets
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Project includes mobilization, traffic control, striping citywide streets
AvailablePremium
Access the largest public sector contact database
Project includes mobilization, traffic control, striping citywide streets
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Project includes mobilization, traffic control, striping citywide streets
AvailableRequest for quotes to perform epoxy pavement striping (epoxy crosswalk blocks — estimated 7,182 SF total; 24" solid line multi-component — estimated 64 LF), plus mobilization and traffic control, at multiple County intersections (CSAH routes listed). Quotes must include signed Division A, pricing, Quote Submittal Form, and Responsible Contractor Certification; award to the lowest responsive, responsible contractor. Submit quotes electronically to the County authorized representative (Zachery Raven).
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Request for quotes to perform epoxy pavement striping (epoxy crosswalk blocks — estimated 7,182 SF total; 24" solid line multi-component — estimated 64 LF), plus mobilization and traffic control, at multiple County intersections (CSAH routes listed). Quotes must include signed Division A, pricing, Quote Submittal Form, and Responsible Contractor Certification; award to the lowest responsive, responsible contractor. Submit quotes electronically to the County authorized representative (Zachery Raven).
AvailableThe existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. A portion of watermain will be updated and upsized. The project also includes surface restoration, traffic control and other related work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis