Summary
This project involves three (3) schedules (A - Sewer, B - 88th Avenue West Storm, and C - Daley Pl Storm) in the construction of the City of Edmonds 2026 Combined Cured in Place Pipe (CIPP) Rehabilitation Project. This Project consists of: Schedule A - Phase 13 Sewer:
Installation of approx. 258 LF of 8" diameter cured-in-place (CIPP) structural liner, along with both pre-construction and post-construction Closed Circuit Television (CCTV) pipe inspection. Schedule B - Phase 6 Storm (88th Avenue West): Installation of approx. 690 LF of 8" diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. Schedule C - Phase 6 Storm (Daley Pl): Installation of approx. 15 LF of 8" diameter, 480 LF of 12" diameter, 520 LF of 15" diameter, and 150 LF of 18" diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. This site will also include 20 LF of 12" diameter PVC and general restoration.