Summary
Construct a complete fiber optic pathway & communication connection to the ASR #2, Heliport 4 & Heliport tank facilities. The work includes but is not limited to the installation of HDPE conduit, fiber optic cable, vaults, building entry components & related appurtenances. Installation methods may include directional boring, trenching & plowing, depending on location, subsurface conditions & field constraints. Work also includes installation through anticipated rock areas, connection to existing duct or vault infrastructure where shown or directed, installation of new vaults, fiber placement, testing, cleanup & restoration of disturbed areas.