Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, carious depths of asphalt patching, milling of existing asphalt pavement, and asphalt paving wiThin the streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, various depths of asphalt patching, milling of existing asphalt pavement, and asphalt paving within the streets.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Removal and replacement of existing concrete including concrete pavement, crosspan, sidewalk, curb and gutter, curb ramps, various depths of asphalt patching, milling of existing asphalt pavement, and asphalt paving within the streets.
AvailablePremium
Access the largest public sector contact database
1. Base Bid: a. The work generally consists of: Milling of 51,967 sq. yards of asphalt roadway at 1 depth on Nemo Road, and overlaying 3.62 miles of 24 wide roadway with (1) 3 lift of Class E Type 1 asphalt.
Posted Date
Dec 6, 2025
Due Date
Dec 23, 2025
Release: Dec 6, 2025
Close: Dec 23, 2025
1. Base Bid: a. The work generally consists of: Milling of 51,967 sq. yards of asphalt roadway at 1 depth on Nemo Road, and overlaying 3.62 miles of 24 wide roadway with (1) 3 lift of Class E Type 1 asphalt.
AvailableThe City of Colorado Springs is soliciting proposals for the 2C Asphalt Overlay project, which includes removal and replacement of asphalt pavement, pavement markings, curb and gutter, and underdrain pipe. The project is a multi-year construction contract (5-year duration) with an estimated budget of $2,000,000–$2,600,000 and requires submission of technical, management, and certification documents.
Posted Date
Nov 20, 2025
Due Date
Jan 16, 2026
Release: Nov 20, 2025
Close: Jan 16, 2026
The City of Colorado Springs is soliciting proposals for the 2C Asphalt Overlay project, which includes removal and replacement of asphalt pavement, pavement markings, curb and gutter, and underdrain pipe. The project is a multi-year construction contract (5-year duration) with an estimated budget of $2,000,000–$2,600,000 and requires submission of technical, management, and certification documents.
AvailableThe City of Colorado Springs is soliciting proposals for the 2C Asphalt Overlay project, which includes removal and replacement of asphalt pavement, pavement markings, curb and gutter, and underdrain pipe. The project is a multi-year construction contract (5-year duration) with an estimated budget of $2,000,000–$2,600,000 and requires submission of technical, management, and certification documents.
Posted Date
Nov 20, 2025
Due Date
Jan 16, 2026
Release: Nov 20, 2025
Close: Jan 16, 2026
The City of Colorado Springs is soliciting proposals for the 2C Asphalt Overlay project, which includes removal and replacement of asphalt pavement, pavement markings, curb and gutter, and underdrain pipe. The project is a multi-year construction contract (5-year duration) with an estimated budget of $2,000,000–$2,600,000 and requires submission of technical, management, and certification documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis