Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Washington County Public Schools is soliciting bids for the replacement of a chiller at Smithsburg Elementary School. Bid documents are available on the WCPS purchasing webpage and the official EMMA posting; final award recommendation and bid tabulation will be posted after Board of Education approval. Bids are due January 7, 2026 at 10:30 AM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Washington County Public Schools is soliciting bids for replacement of a chiller at Lincolnshire Elementary School. Bid documents are hosted on the Washington County Public Schools purchasing website; final award recommendation and bid tabulation will be posted on the WCPS Bid Results after Board of Education approval. The solicitation is an Invitation for Bid with a due date of January 7, 2026 at 10:30 AM.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
Washington County Public Schools is soliciting bids for replacement of a chiller at Lincolnshire Elementary School. Bid documents are hosted on the Washington County Public Schools purchasing website; final award recommendation and bid tabulation will be posted on the WCPS Bid Results after Board of Education approval. The solicitation is an Invitation for Bid with a due date of January 7, 2026 at 10:30 AM.
Premium
Access the largest public sector contact database
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
Posted Date
Nov 24, 2025
Due Date
Dec 12, 2025
Release: Nov 24, 2025
Close: Dec 12, 2025
Project consists of a central plant replacement at Elementary School. The existing gas-fired hot water boilers and chiller will be replaced and the existing piping will be reworked to support these replacements. The electrical scope is also limited to supporting these replacements.
Berkshire Hills Regional School District seeks bids to remove the existing chiller and install a new approximately 190‑ton air‑cooled chiller with associated glycol chilled water piping, heat exchanger, pump, insulation, controls, and electrical work at Muddy Brook Elementary School, 318 Monument Valley Road, Great Barrington, MA. Bids are due December 16, 2025 at 2:00 PM EST.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Berkshire Hills Regional School District seeks bids to remove the existing chiller and install a new approximately 190‑ton air‑cooled chiller with associated glycol chilled water piping, heat exchanger, pump, insulation, controls, and electrical work at Muddy Brook Elementary School, 318 Monument Valley Road, Great Barrington, MA. Bids are due December 16, 2025 at 2:00 PM EST.
AvailableReplace 3 (169.6 ton) Air Cooled Scrolling Chillers voltage 480 volts (in kind) When replacing Chillers, if during outside temperature greater than 60 degrees one chiller must remain operational during change out. One chiller is currently being cannibalized to provide parts for the other two chillers. Chillers exterior shall be made of aluminum or galvanized steel with a protective coating designed for marine coastal environment. Coils to made of aluminum or other materials designed for marine coastal environment.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
Close: Dec 12, 2025
Replace 3 (169.6 ton) Air Cooled Scrolling Chillers voltage 480 volts (in kind) When replacing Chillers, if during outside temperature greater than 60 degrees one chiller must remain operational during change out. One chiller is currently being cannibalized to provide parts for the other two chillers. Chillers exterior shall be made of aluminum or galvanized steel with a protective coating designed for marine coastal environment. Coils to made of aluminum or other materials designed for marine coastal environment.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis