Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work generally consists of pavement repairs (asphalt over concrete, concrete and/or full depth asphalt) above water main repair areas. Work includes 50 LF of removal and replacement of concrete curb; 50 LF of underdrains; 500 SY Of asphalt on concrete base pavement repair; 100 SY of asphalt pavement repair; 100 SY of concrete pavement repair. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide 2026-2028 As Needed Line Painting and Pavement Marking Maintenance Contract.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Provide 2026-2028 As Needed Line Painting and Pavement Marking Maintenance Contract.
AvailablePremium
Access the largest public sector contact database
Supplying petroleum products for 2026-2028. Supply of unleaded gasoline, diesel, oil and lubricants for the calendar years of 2026, 2027 and 2028 (a three (3) year bid).
Posted Date
Nov 21, 2025
Due Date
Dec 15, 2025
Release: Nov 21, 2025
Close: Dec 15, 2025
Supplying petroleum products for 2026-2028. Supply of unleaded gasoline, diesel, oil and lubricants for the calendar years of 2026, 2027 and 2028 (a three (3) year bid).
AvailableCustodial supplies cooperative 2026-2028.
Posted Date
Nov 24, 2025
Due Date
Jan 14, 2026
Release: Nov 24, 2025
Close: Jan 14, 2026
Custodial supplies cooperative 2026-2028.
AvailableThe general items of work include saw-cutting the pavement, remove asphalt, base, dirt and cold plane, compact the native soil, place steel plates as needed, construct a 3-6" asphalt concrete, restore striping with thermoplastic and red curb, clean up, and leave in an operable and acceptable condition all the work and other items not mentioned that are required by the specifications.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
The general items of work include saw-cutting the pavement, remove asphalt, base, dirt and cold plane, compact the native soil, place steel plates as needed, construct a 3-6" asphalt concrete, restore striping with thermoplastic and red curb, clean up, and leave in an operable and acceptable condition all the work and other items not mentioned that are required by the specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis