Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This contract will include roadway pavement reclamation, milling, paving and preventative maintenance measures (crack and fog sealing) on the specified road segments. The work will also include reconstruction of ada / aab pedestrian curb ramps, hma driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, curbing, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. The proposed work also includes supplying all the necessary traffic controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Include roadway pavement reclamation, milling, paving and preventative maintenance measures (crack and fog sealing) on the specified road segments. The work will also include reconstruction of Americans with Disabilities Act (ADA) / Architectural Access Board (AAB) pedestrian curb ramps, HMA driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, curbing, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. The proposed work also includes supplying all the necessary traffic controls. Road segments have been selected and assigned to be completed in either 2026 or 2027 based on the Town of Concords 5-year Pavement Management Program.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
Include roadway pavement reclamation, milling, paving and preventative maintenance measures (crack and fog sealing) on the specified road segments. The work will also include reconstruction of Americans with Disabilities Act (ADA) / Architectural Access Board (AAB) pedestrian curb ramps, HMA driveway apron reconstruction, earth excavation, pavement marking and crosswalk restriping, curbing, traffic sign installation, minor drainage improvements, sewer manholes casting adjustment and replacement, water gate boxes adjusting and other incidental work. The proposed work also includes supplying all the necessary traffic controls. Road segments have been selected and assigned to be completed in either 2026 or 2027 based on the Town of Concords 5-year Pavement Management Program.
AvailableThe City of Eudora is soliciting sealed bids for its 2026 Pavement Management Program – Chip Seal. The work includes approximately 59,307 square yards of chip seal asphalt pavement surfacing and traffic control in accordance with KDOT and project specifications, with bonding and a two-year warranty required. Bids are due on February 3, 2026 at 2:00 pm (local time), and the solicitation was issued on January 16, 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
The City of Eudora is soliciting sealed bids for its 2026 Pavement Management Program – Chip Seal. The work includes approximately 59,307 square yards of chip seal asphalt pavement surfacing and traffic control in accordance with KDOT and project specifications, with bonding and a two-year warranty required. Bids are due on February 3, 2026 at 2:00 pm (local time), and the solicitation was issued on January 16, 2026.
FLORESVILLE ISD is soliciting proposals for a fixed-price contract for school food service management services for the 2026-2027 School Year.
Posted Date
Jan 5, 2026
Due Date
Feb 9, 2026
Release: Jan 5, 2026
Close: Feb 9, 2026
FLORESVILLE ISD is soliciting proposals for a fixed-price contract for school food service management services for the 2026-2027 School Year.
AvailablePavement management program (in streetsaver), including condition survey, GIS field and linkage updates and engineering services for repair strategies of various streets.
Posted Date
Jan 15, 2026
Due Date
Feb 10, 2026
Release: Jan 15, 2026
Close: Feb 10, 2026
Pavement management program (in streetsaver), including condition survey, GIS field and linkage updates and engineering services for repair strategies of various streets.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis