Summary
Widen roadway to specified width, place 400 - 600 Lbs./SY rate of asphalt binder in lift thicknesses. Full Depth Patch will consist of contractor saw-cutting clean lines and removing existing damaged asphalt approved by County in pre-marked locations, place 400 - 600 Lbs./SY of HMA Intermediate Base Type B or Type C (as will be specified in SCDOT Encroachment Permit). Proper edge milling is required at curb/gutter, drives, and in all areas specified by the county appointed project manager. 1.75" uniform milling will be required prior to placement of asphalt. A milled surface cannot be exposed for more than 7 calendar days. Concrete saw-cutting is required where concrete drives meet new pavement to ensure smooth asphalt edges against concrete.