City of Watertown
The City of Watertown is requesting bids for the construction of the 2026 10th Ave NW Water Main Project, including installation of approximately 600 linear feet of 8-inch C900 fusible water main, two fire hydrants, associated sidewalk work, and traffic control. The project is expected to be completed by June 1, 2026 and bidding closes on November 25, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Watertown
The project includes: approx. 600 LF of 8" C900 fusible water main will be bored from the existing watermain at the intersection of 10th Ave NW and Highway 20 to the West. 2 fire hydrants, and all necessary joints, parts, and incidental work to bore and install the watermain shall be installed. Install 50 SF of 4" conc sidewalk; furnish and install 10 LF of 10" PVC pipe; furnish and install 2 Ea fire hydrant. See attached file.
Posted Date
Nov 8, 2025
Due Date
Nov 25, 2025
Release: Nov 8, 2025
City of Watertown
Close: Nov 25, 2025
The project includes: approx. 600 LF of 8" C900 fusible water main will be bored from the existing watermain at the intersection of 10th Ave NW and Highway 20 to the West. 2 fire hydrants, and all necessary joints, parts, and incidental work to bore and install the watermain shall be installed. Install 50 SF of 4" conc sidewalk; furnish and install 10 LF of 10" PVC pipe; furnish and install 2 Ea fire hydrant. See attached file.
AvailableLincoln County
The Project includes the following Work: replacing an existing 12-inch PVC water main system with 11,010 LF of new 12-inch ductile iron water main, 1,458 LF of 6-inch water main and 529 LF of 2-inch PVC water main and appurtenances.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Lincoln County
Close: Dec 4, 2025
The Project includes the following Work: replacing an existing 12-inch PVC water main system with 11,010 LF of new 12-inch ductile iron water main, 1,458 LF of 6-inch water main and 529 LF of 2-inch PVC water main and appurtenances.
AvailableBorough of Chambersburg
Project consists of water main extension project. See attached file.
Posted Date
Sep 12, 2025
Due Date
Dec 9, 2025
Release: Sep 12, 2025
Borough of Chambersburg
Close: Dec 9, 2025
Project consists of water main extension project. See attached file.
AvailableBarrow County
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Barrow County
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis