Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Watertown
The project includes: approx. 600 LF of 8" C900 fusible water main will be bored from the existing watermain at the intersection of 10th Ave NW and Highway 20 to the West. 2 fire hydrants, and all necessary joints, parts, and incidental work to bore and install the watermain shall be installed. Install 50 SF of 4" conc sidewalk; furnish and install 10 LF of 10" PVC pipe; furnish and install 2 Ea fire hydrant. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Village of McFarland
Work includes approx 500 LF 8" water main; 10 LF 10" DI water main; 37 LF 1" copper water service laterals; 458 SY excavation, rmoval and disposal of existing asphalt pavement. See outside ink.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
Village of McFarland
Close: Nov 20, 2025
Work includes approx 500 LF 8" water main; 10 LF 10" DI water main; 37 LF 1" copper water service laterals; 458 SY excavation, rmoval and disposal of existing asphalt pavement. See outside ink.
AvailableLincoln County
The Project includes the following Work: replacing an existing 12-inch PVC water main system with 11,010 LF of new 12-inch ductile iron water main, 1,458 LF of 6-inch water main and 529 LF of 2-inch PVC water main and appurtenances.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Lincoln County
Close: Dec 4, 2025
The Project includes the following Work: replacing an existing 12-inch PVC water main system with 11,010 LF of new 12-inch ductile iron water main, 1,458 LF of 6-inch water main and 529 LF of 2-inch PVC water main and appurtenances.
AvailableCity of Wessington Springs
The major elements associated with the construction of the project are: 2,445 feet of 6-inch water main; 1,099 feet of 8-inch water main; 33 feet of encasement for water main; 30 water services with saddles, valves and connections; 857 feet of water service pipe; etc.
Posted Date
Nov 5, 2025
Due Date
Nov 20, 2025
Release: Nov 5, 2025
City of Wessington Springs
Close: Nov 20, 2025
The major elements associated with the construction of the project are: 2,445 feet of 6-inch water main; 1,099 feet of 8-inch water main; 33 feet of encasement for water main; 30 water services with saddles, valves and connections; 857 feet of water service pipe; etc.
AvailableCity of Minneapolis
Water main cleaning and lining.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
City of Minneapolis
Close: Dec 9, 2025
Water main cleaning and lining.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis