Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following Work: Install 2 new influent pumps; Install 1 new influent screen with 1 new washer / compactor; Construct a second aerobic treatment basin, CIP; Install new diffused aeration system within the existing aerobic digester; Construct blower pad and install two blowers with piping; Remove and replace Waste Activated Sludge (WAS) pump; Install launder covers in the two existing final clarifiers with clarifier mechanism repaint as alternate; Headworks building improvements - HVAC & Soffit; Associated site, piping and electrical improvements to accommodate new infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for qualifications for professional engineering services for improvements at the Central and North Wastewater Treatment Facilities (WWTF's), including a new North Screening & Pump Station, force main, and Central WWTF upgrades.
Posted Date
-
Due Date
Dec 15, 2025
Release: -
Close: Dec 15, 2025
Request for qualifications for professional engineering services for improvements at the Central and North Wastewater Treatment Facilities (WWTF's), including a new North Screening & Pump Station, force main, and Central WWTF upgrades.
Premium
Access the largest public sector contact database
Add a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
Posted Date
Oct 17, 2025
Due Date
Dec 16, 2025
Release: Oct 17, 2025
Close: Dec 16, 2025
Add a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
AvailableAdd a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
Posted Date
Oct 17, 2025
Due Date
Dec 16, 2025
Release: Oct 17, 2025
Close: Dec 16, 2025
Add a new secondary clarifier with new effluent pump, new metering and flow splitting structures, replacement Return Activated Sludge and Waste Activated Sludge (RAS/WAS) pump station, two additional aerobic digesters with submersible self-aspirating aerators, new electrical and control building with new motor control center and master control panel, upgraded PG&E power service, new generator, and associated improvements to yard piping, grading, paving, power and control conduit and wiring, instrumentation, and PLC/SCADA controls. The work involves upgrading an existing wastewater treatment process and complete replacement of the electrical and control system for that facility.
AvailableProject includes architectural, mechanical, and electrical modifications. The existing dechlorination building is to be demolished; new chemical dosing pumps and tanks are to be installed; structural and electrical modifications are to accompany the installation of a new uv disinfection system in the existing uv disinfection/effluent channel; new rotary lobe sludge transfer pumps are to be installed to replace the existing progressive cavity pumps. See outside link.
Posted Date
Nov 3, 2025
Due Date
Dec 16, 2025
Release: Nov 3, 2025
Close: Dec 16, 2025
Project includes architectural, mechanical, and electrical modifications. The existing dechlorination building is to be demolished; new chemical dosing pumps and tanks are to be installed; structural and electrical modifications are to accompany the installation of a new uv disinfection system in the existing uv disinfection/effluent channel; new rotary lobe sludge transfer pumps are to be installed to replace the existing progressive cavity pumps. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis