Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provision of aerobic digester blowers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Premium
Access the largest public sector contact database
The project consists of replacement of buried digester gas piping with HDPE pipe, new buried PVC digester sludge pipe, replacement of exposed digester gas piping and valves in an existing manhole with new stainless steel piping.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The project consists of replacement of buried digester gas piping with HDPE pipe, new buried PVC digester sludge pipe, replacement of exposed digester gas piping and valves in an existing manhole with new stainless steel piping.
AvailableThe project consists of replacement of buried digester gas piping with HDPE pipe, new buried PVC digester sludge pipe, replacement of exposed digester gas piping and valves in an existing manhole with new stainless steel piping.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
The project consists of replacement of buried digester gas piping with HDPE pipe, new buried PVC digester sludge pipe, replacement of exposed digester gas piping and valves in an existing manhole with new stainless steel piping.
AvailableRemoval of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.
Posted Date
Mar 20, 2025
Due Date
Jan 21, 2026
Release: Mar 20, 2025
Close: Jan 21, 2026
Removal of the existing annular gas seal between the lid and the wall of Digester 5 and supply, installation and testing of a new annular gas seal.