Summary
Removal and replacement of approx. 1,875 LF of existing 8" water main with 8 inch PVC C-900 water main pipe, 4,406 LF of existing 12" water main with 12" PVC C-900 water main pipe, and 1,011 LF of existing 16 inch water main with 16" PVC C-900 water main pipe; removal and replacement of approx. 2,885 LF of water services; replacement and installation of thirteen (13) hydrants; installation of approx. 79 gate valves; approx. 6,475 SY of Initial Municipal/County Pavement restoration, approx. 22,875 SY of Final Pavement restoration, and all required testing, disinfection, restriping, traffic control and site restoration required.