Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes approx. 20,807 LF of 8" C900 PVC and fittings, Complete in Place; 45 EA Fire Hydrant Assembly; 18,817 SY of 6" Asphalt Removal and Patching; 462 EA of Water Service Tap Reconnection; 1,890 LF of 12" C900 PVC and fittings, Complete in Place; 2 EA of Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place and 101 of SY Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in Place.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
Posted Date
Dec 13, 2025
Due Date
Jan 14, 2026
Release: Dec 13, 2025
Close: Jan 14, 2026
Procurement of services for the North Avenue - Bancroft to Higgins Water Main Replacement Project, including the installation of water mains, services, associated fittings, fire hydrants, and restoration work.
AvailablePremium
Access the largest public sector contact database
Work includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Work includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
AvailableThe City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
Posted Date
Aug 7, 2025
Due Date
Aug 7, 2026
Release: Aug 7, 2025
Close: Aug 7, 2026
The City of Keene seeks a qualified engineering firm to perform design and related services for the Court St River Crossing Water Main Replacement Project, which includes replacing approximately 5,000 linear feet of water main and installing a new 12-inch HDPE pipe including an HDD crossing beneath the Ashuelot River. The selected consultant will provide preliminary engineering and design, environmental documentation and permitting, public engagement, and construction administration support.
AvailableWater main replacement.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Water main replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis