Summary
Project consists of Ellys way: full depth mill & overlay (5" minimum) 7,458 SY; sawcutting 275 LF; HMA pavement 3 LT 58-28 S (3" binder) 1345 ton; HMA pavement 4 LT 58-28 S (2" surface) 895 ton; 30" concrete curb and gutter spot replacement (estimated) 650 LF: sanitary manhole chimney reconstruction 12 EA; excavation below subgrade (estimated 15%) 560 CY; 3" base aggregate dense (EBS areas) (12") 750 ton; base aggregate dense 1 1/4" (EBS areas) (6") 370 ton; Beaus Bay Street: full depth mill & overlay (5" minimum) 1080 SY; sawcutting 50 LF; HMA pavement 3 LT 58-28 S (3" binder) 370 ton; hma pavement 4 LT 58-28 S (2" surface) 250 ton; 30" concrete curb and gutter spot replacement (estimated) 80 LF. See attached file.