Summary
The project will include the following described construction: the furnishing, installing, and testing of approx 4,668 LF of 18" pvc gravity interceptor sewer main replacements and concrete manholes, and unclassified excavation, stream crossings, sediment / erosion control procedures, rip-rap streambank stabilization, backfill, tie-ins of all lines entering existing manholes, bypass pumping of wastewater flows, working in close proximity with other utilities, testing, reconnections/tie-ins, sewer service reconnections, surface and property restoration, pavement restoration, and all other appurtenances.